WQOs Exceedance Caused by Project
(Post-construction)
Notes:
As I have shown on the last slide, there are several parameters that the Bay currently exceeds. One of the things that we wanted to focus on for our analysis are parameters that are not currently exceeded, or the areas where they are not exceeded, and would the project actually cause those things to be exceeded. And for the chemicals that we evaluated for the post-construction evaluation, we found a small area on the edge of that sediment plume that would increase polynuclear aromatic hydrocarbons above the water quality standards.